The DJ is highlighting the installation of the new (replacement) power pole at the B'way – 101 interchange
Work began Friday, Dec. 11, and is expected to be completed by Sunday, Dec. 13, as crews assemble a 130-foot steel pole near the Broadway overpass designed to hold the high-voltage lines sent sprawling across the highway after heavy equipment accidentally knocked down the previous structure, said a Pacific Gas and Electric spokesman Joe Molica.
As we know from the comments on the September post here, traffic and creative driving have been an issue there during construction. I loved this quote from the PG&E guy in the piece
“For safety purposes, everyone keep their eyes on the road,” he said.
Solid advice all over town.


Leave a Reply